Electrical Engineer - Namal Education Foundation
2018 - 2019
Working as an MEP Engineer & Following are the details of responsibilities:
Review of Engineering Drawing, Planning, Installation, Testing & Commissioning, Repair & Maintenance, Quality Assurance, Inspection and Fault Rectification of Following Electrical, Mechanical & Plumbing Work.
1. Transformers (630 KVA,400 KVA & 200 KVA Pole Mounted Step Down)
2. L.V Switch Gears & Distribution Boards:
Main LT Panel Board (MLTP) Main Panel Board (MPB) Sub Main Panel Board (SMPB-Light Power & UPS)
3. Automatic Power Factor Improvement Plant (PFIP)
4. Auto Mains Failure and Auto Transfer Switch (AMF / ATS)
5. Distributions Boards & Light Control Panel (LCP) & Circuits.
6. Cables, Conduits, Cable Trays & Underground Cabling System.
7. Earthing System (Earth Electrode, Earth Connecting Point, Inspection Chamber & Testing).
9. Emergency Diesel Generator Set, Motors, Pumps & Uninterruptable Power Supply.
10. Lighting Protection System & Solar Photo Voltaic System.
11. Fire Alarm & Detection System, Telecommunication, CCTV & Voice system, Data Networking system.
12. Heating, Ventilating, and Air Conditioning (HVAC) System.
13. Water Supply System, Drainage System & Sewer System.
Project Engineer - Sui Northern Gas Pipelines Limited
2015 - 2017
Working as a Pipeline Engineer, providing Pipeline engineering and Construction Supervision at SNGPL including:
1. Review of engineering drawings to ensure compliance.
2. Right of way clearing and grading.
3. Hauling and stringing of line pipe according to class location.
4. Pipeline welding as per the qualified welding procedure specification.
5. Tie-In and Crossings.
6. Welding joint insulation with Heat Shrinkable Sleeves.
7. Air Pigging Testing, Soap Testing, Yo-Yo Testing & Hydro testing.
8. Commissioning.
10. Final Documentation
Responsible for material stock management, generating material requirements and follow up to ensure timely and uninterrupted flow of resources for site activities in coordination with Procurement and Store Departments.
Formal correspondence between Head Office and Site Office for timely resolution of matters and for obtaining financial approvals.
Preparation and submission of daily site progress/activities report & Performing Risk Assessment for all Pipeline Activities
Ensure that all activities are carried out in a safe manner and in adherence to Company HSE policy.
Participate and conduct TBT ,HSE Trainings & Performing Risk Assessment for all Pipeline Activities.
Performing Routine Safety Audit as per company HSE requirement.
Assistant Engineer Electrical - Khairpur Sugar Mill Limited
2015 - 2015
Working as an Assistant Engineer Electrical & Following are the details of the responsibilities:
1. Trouble shooting of routine issues, Major and Minor Inspection & Fault Rectification.
2. Implemented starting circuits of LV&MV Motors to avoid high inrush current &heavy standstill torques on motors.
3. Operation and Maintenance of Power Transformers, Circuit breakers, synchronizing control panel, Generator, Motors, CTs and PTs, Battery chargers & repair machines breakdown.
4. Maintenance of Underground Cabling.
5. Prepare material cost, reports, Annual and schedule overhauling of motors.
6. Work on low voltage/medium/high voltage cables.
Planning of Maintenance:
•Management of maintenance plans, reporting of planned and unplanned work orders.
•Preparation of spare parts lists, staffing for maintenance Tasks & Measuring worker productivity
Field Engineer - Al-Faisal Enterprises
2014 - 2015
Working as a Field Engineer & Following are the details of the responsibilities:
(I.E.: “H.t/L.t Proposals &Village Electrification Programmed, Installation of Aerial Bundled Cables, Safe handling / Shifting and installation of HT PCC/Poles and LT PCC/Spun Poles and Installation of Pre-Stressed concrete cement poles”)
Honours And Awards
No Timeline To Show.