Ahsaan Zahid
Profile URL Available.
Monitoring Officer
BRAC Pakistan
B.E Chemical
Mehran University Of Engineering & Technology, Jamshoro
Summary
Goal-oriented individual with a pleasant personality and a tenacity having more than three years working experience in donor funded and client-based organizations. A multitasking competent professional supporting the field monitoring with effective document evaluation, report writing, and excellent management skills.
Experience
Monitoring Officer - BRAC Pakistan
2017 - Present
1. Monitoring
1.1 Develop project monitoring plan (PMP) of the projects in line with project LFA and in consultation with program teams
1.2 Coordinate with respective program teams for collection of data against agreed indicators
1.3 Engage with program teams to collect and manage essential data of their respective projects
1.4 Ensure quality of data collected from the field
1.5 Provide feedback to program teams and Head of Monitoring on projects’ performance based on monitoring data findings
1.6 Assist Head of Monitoring in building capacity of program teams
2. Evaluation
2.1 Assist Head of Monitoring in designing, coordinating and conducting project evaluations (mid-term and end-line)
2.2 Provide support in designing and conducting Post-Implementation Monitoring Survey (PIMS)
2.3 Provide support in conducting Program Data Review
Project Engineer/Trainee Engineer - Revgreen Pvt Pakistan
2016 - 2017
Job Description
1. Before Streamline of Plant
- Community surveys for the awareness of collecting raw material. (Buffalo/Cow Dug) and data collection in remote rural areas of Punjab.
- Drawing and revising PFDs.
- Motivation of community for not using dung before bio energy extraction process.
- Managing daily plant labour.
- Managing the required buffalo dung for the daily intake of biogas plant.
- Installation of all pipelines, pumps, compressors, scrubbers, valves and gas tanks.
- Commissioning of plant.
- 2. After Streamline of Plant
- 2.1 Quality Control testing of raw material.
- 2.2 Managing daily required of raw material.
- 2.3 Labour management of feeding centrifugal pumps.for raw material batch in fixed ratio
- 2.4 Pre-filtration (Chemical Sweetening) before compression and storage.
- 2.4 Compression of gas through piston compressors and storage in tanks.
- 2.5 Water scrubbing of compressed gas for CO2 removal.
- 2.6 Post filtration (Chemical Absorption) for the water removal.
- 2.7 Distribution of gas to generator and boiler.
- Inventory Management.
- 2.8 Dealing with clients on behalf of Revgreen to ensure the payment accordance with work performance and bio-gas generation.