Jamshed Ali
Profile URL Available.
Planning Engineer
Petron KSA
B.Sc.
University of Engineering and Technology, Lahore.
Summary
Experience
Planning Engineer - Petron KSA
2014 - 2017
Projects Handled:
v Unilube Asphalt Storage Tanks & Vessels- Fabrication & Erection
(June’14 to June’15)
v MEP Petron Saudi Project - by Construction Projects Specialist Conctracting Co. Ltd.
(July’14 to Sep’15)
v
Planning Engineer - Descon 2013 - 2014
EPC Project: Gas Processing Facilities (GPF) for MOL Pakistan Oil & Gas Company
Significant Highlights :-
§ Prepare a chronological Baseline schedule from Engineering Design in relation to construction, mechanical equipment completion, to start up utilizing Primavera Project Planner (P3 & P6) with proper WBS and OBS, resource loading, activity codes & graphical presentation of every stage of the EPC Project.
- Established professional credibility in the areas of project, planning & scheduling, resource mobilization planning and monitoring to ensure erection of piping within defined time parameters.
- Periodic progress report monitoring on Look-ahead schedules, S-curves and Histograms to determine earn values.
- Monitor the progress against the base line schedule.
- Preparing method statements, Test Packs, Technical Queries & Punch Lists.
- Actual site inspection to determine the progress and balance work of piping in every line activity to monitor the performance of the piping of project to ensure that the project schedule must follow.
Planning Engineer - Descon Kuwait
2010 - 2013
Project: Erection of Structural Steel, Mechanical Works & Refractory for 5500 TPD Kuwait Cement Company Line II Expansion-Kuwait
Significant Highlights :-
§ Prepare Project Master Schedule level IV plan using Primavera Project Planner P3 & P6 keeping in view the project with scope of about 15000 tons of mechanical erection work, 8300 tons of structural steel & 4700 tons of refractory.
§ Generate Resource Loading Curves, Manhours/Qty. Histograms, and S-curves for progress monitoring using P3 & P6.
§ Good knowledge and understanding of preparing Enterprise Project Structure (EPS), integrated OBS& WBS, establish baseline plan, global change report.
§ Updating weekly work schedule with Primavera P3 & P6 and generate 8 weeks look ahead schedule to determine the material/work front availability status in coordination with area supervisors & Warehouse In-Charge.
§ Discipline-wise/area wise progress, manpower, equipment& efficiency reports on daily, weekly & monthly basis.
§ Identify and arrange the resources required to execute the job on the basis ofS-Curves for each discipline by the use of PROCeSs& generate project top sheet including Latest Forecast plan details & Earned progress status.
Supply & Fabrication of Structural Steel & Plate works for 5500 TPD Kuwait Cement Company
Line II Expansion-Kuwait
- Preparation of package wise and category wise scope for plate works & structural steel.
- Preparation of invoices, Material Consumption Reports, MTO/BOQ vs. Delivery notes, manifesto details against shipments, Area wise & requisition wise invoice summary preparation.
- Allocate fabrication package to various subcontractors as per the sequence of erection.
- Monitor fabrication progress on the basis of weekly & monthly reports.
Honours And Awards
No Timeline To Show.
- 2024 kbs International pvt ltd, All rights reserved. Use of this website constitutes acceptance of Terms & Conditions & Privacy Policy